大理石電梯門套施工工藝要注意什么!
基層墻面處理-壁鉆打槽-鍍鋅線或銅線與線連接,裝配線-大理石板安裝-注漿-裂紋-清洗-的清潔-綜合檢查和驗(yàn)收。
Base course wall treatment - wall drilling and grooving - connection of galvanized wire or copper wire with wire, assembly line - marble slab installation - grouting - crack - cleaning - comprehensive cleaning - comprehensive inspection and acceptance.
三、大理石電梯門套施工步驟
3、 Construction steps of marble elevator door pocket
石材選型:用比色法對(duì)石材的顏色進(jìn)行選擇和分類。安裝在同一表面的石材的顏色應(yīng)一致。
Stone selection: use colorimetric method to select and classify the color of stone. The color of stones installed on the same surface shall be consistent.
墻基清洗:清洗墻壁,安裝底座支架。同時(shí),執(zhí)行結(jié)構(gòu)套筒,查找規(guī)則,彈出垂直線和水平線。根據(jù)設(shè)計(jì)圖紙和實(shí)際需要,彈出安裝石材的位置線和砌塊線。(stone石研究協(xié)會(huì)
Wall base cleaning: clean the wall and install the base bracket. At the same time, execute the structural sleeve, find the rules, and pop up the vertical and horizontal lines. According to the design drawings and actual needs, snap the location line and block line for the installation of stones. (stone Stone Research Association
陣容:根據(jù)大小,一個(gè)好的建筑,提前石材安裝前與經(jīng)緯儀兩垂直線下面,更好在500px的位置從大角,為了檢查豎線掛的準(zhǔn)確,確保順利安裝,控制線上下。
Line up: According to the size, a good building should be installed under the two vertical lines of the theodolite before the stone is installed in advance, preferably from the large angle at the position of 500px. In order to check the accuracy of the vertical line and ensure the smooth installation, control the line and the line.
安裝底部托架,并將預(yù)置支架安裝在樓板上,按照上平線安裝。支架要支撐牢固,便于相互連接,也可以和架在一起,支架后,沿著支架的方向,將長(zhǎng)50毫米厚木板在同一水平面動(dòng),以確保在同一水平面上的石材。
Install the bottom bracket, install the preset bracket on the floor, and install it according to the upper horizontal line. The support shall be firmly supported to facilitate mutual connection, and can also be connected with the support. After the support, the 50 mm thick board shall flow on the same horizontal plane along the direction of the support to ensure the stone on the same horizontal plane.
安裝連接部件:用設(shè)計(jì)中指定的不銹鋼螺栓固定角鋼和平板鋼板。調(diào)整平鋼板的位置,使平鋼板的孔與石板的插入孔重合,固定扁鋼板并扣緊扳機(jī)。
Install connecting parts: fix angle steel and flat steel plate with stainless steel bolts specified in the design. Adjust the position of the flat steel plate so that the hole of the flat steel plate coincides with the insertion hole of the stone plate, fix the flat steel plate and tighten the trigger.
大理石裝飾板式安裝:根據(jù)凹槽和部件找到一個(gè)好的位置,底板可放置在墻角處。
Marble decorative plate installation: find a good position according to the groove and parts, and the base plate can be placed at the corner of the wall.
面板微調(diào):安裝大理石裝飾板,調(diào)節(jié)水位。如果板上嘴不均勻,則可將相應(yīng)的雙股銅線墊放置在連接在板底下端的平板鋼板上。調(diào)整垂直度,調(diào)整面板頂部的不銹鋼接頭與墻壁之間的間隙,直到面板垂直。
Panel fine adjustment: install marble decorative plate to adjust the water level. If the mouth on the plate is uneven, the corresponding double-stranded copper wire pad can be placed on the flat steel plate connected to the lower end of the plate bottom. Adjust the verticality, and adjust the gap between the stainless steel joint on the top of the panel and the wall until the panel is vertical.
的頂部裝飾板塊安裝:的頂部板水平,除了按照一般石材安裝要求安裝好,裂縫的結(jié)構(gòu)和板懸掛長(zhǎng)度為20毫米厚板條,板條的平面板上的250毫米,吊點(diǎn)可以連接在鐵。可以用彩色鋁線懸掛木棒,在木桿掛起后,即在石板與墻面之間填滿,并填緊實(shí),防止注漿滲漏。
Installation of top decorative plate: the last top plate is horizontal. In addition to being installed according to general stone installation requirements, the crack structure and plate suspension length are 20mm thick slats, and 250mm on the flat plate of Flat noodles. The lifting point can be connected to iron. The wooden rod can be hung with colored aluminum wire. After the wooden rod is hung, it is filled between the stone slab and the wall, and filled tightly to prevent grouting leakage.
清洗大理石表面:去除大理石表面的防污污垢,用棉線擦拭石材。
Clean the marble surface: remove the anti-fouling dirt on the marble surface, and wipe the stone with cotton thread.
大理石電梯門套使用越來越多,不僅要按正確的方法工作,以后還要注意保養(yǎng),這樣才能延長(zhǎng)電梯門套的使用壽命。
Marble elevator door jambs are used more and more. Not only should we work in the correct way, but also pay attention to maintenance in the future, so as to extend the service life of elevator door jambs.
有了不銹鋼電梯門套上面的小總結(jié),希望對(duì)廣大客戶有所幫助,如果有什么不理解的或者尋求幫助的請(qǐng)點(diǎn)擊我們的網(wǎng)站:http://shenhaifb.com.cn或者來電咨詢,我們會(huì)盡全力為您
With the summary above the stainless steel elevator door pocket, I hope it can help our customers. If you have any questions or need help, please click our website: http://shenhaifb.com.cn Or call for consultation, and we will do our best to solve it for you
下一篇:不銹鋼門套線包邊施工步驟有哪些?上一篇:不銹鋼電梯門套定制需要注意什么!